Fountain Inn Nursing & Rehab |
Tavares, Florida |
|
Scope of work
Services installed
|
Institute for Healthy Living |
Jupiter, Florida |
|
Scope of work
Services installed
|
|
Brooks Health System - Bartram Campus - Skilled Nursing Facility |
Jacksonville, Florida |
(Under Construction) |
Scope of work
Services installed
|
76,762Sq ft. - 98 bed rehabilitation hospital. Coordinate with fire sprinkler and electrical contractors using to develop a optimum design within a designated budget. Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers. Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters. Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.
|
Owner: Brooks Health Systems. General Contractor: Fickling Construction Inc. Architect: O'Keefe-Painter Architects LLC. Engineer: Mohan Engineering, Inc.
|
Villages Rehabilitation Center |
Town of Lady Lake, Florida |
(Under Construction)
|
Scope of work
Services installed
|
49,170sq ft. - 120 bed rehabilitation hospital. Coordinate with fire sprinkler, electrical and plumbing contractors using 3D MEP coordination software to develop a optimum design within a designated budget. Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers.
|
Owner: Lady Lake Re, LLC. General Contractor: Cullison-Wright Construction corp. Architect: O'keefe - Painter Architects, LLC. Engineer: Mohan Engineering, Inc.
|
Harnett Nursing and Rehabilitation Center |
Lillington, North Carolina |
(Under Construction) |
Scope of work
Services installed
|
48,142sq ft. - 96 bed rehabilitation hospital. Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget. Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters. Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.
|
General Contractor: Integrated Construction LLC. Architect: Jones & Jones Architects PC Engineer: C. T. Clayton Sr., P.E., Inc
|