MEDIC AIR SYSTEMS INC.

HVAC, MECHANICAL, PLUMBING AND MEDICAL GAS CONTRACTOR

 

 

Fountain Inn Nursing & Rehab

Tavares, Florida

 

Scope of work

New Construction

Renovation

Service

 


Services installed

HVAC/Mechanical

 

   

 

 

Institute for Healthy Living

Jupiter, Florida

 

Scope of work

New Construction

Renovation

Service

 


Services installed

HVAC/Mechanical

Plumbing

Medical Gas

3D MEP Coordination Drawings

 

 

 

 

 

 

 

 

Brooks Health System - Bartram Campus - Skilled Nursing Facility

Jacksonville, Florida

(Under Construction)

Brooks Health System - Bartram Campus - Skilled Nursing Facility - Jacksonville FL. 2012-2013

Scope of work

New Construction

Renovation

Service

 


Services installed

HVAC/Mechanical

Plumbing

Medical Gas

3D MEP Coordination Drawings

76,762Sq ft. - 98 bed rehabilitation hospital.

Coordinate with fire sprinkler and electrical contractors using to develop a optimum design within a designated budget.

Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers.

Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters.

Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.

 

Owner: Brooks Health Systems.

General Contractor: Fickling Construction Inc.

Architect: O'Keefe-Painter Architects LLC.

Engineer: Mohan Engineering, Inc.

 

 

 

 

 

 

Villages Rehabilitation Center

Town of Lady Lake, Florida

(Under Construction)

Villages Rehabilitation Center Villages Rehabilitation Center

Scope of work

New Construction

Renovation

Service

 


Services installed

HVAC/Mechanical

Plumbing

Medical Gas

3D MEP Coordination Drawings

49,170sq ft. - 120 bed rehabilitation hospital.

Coordinate with fire sprinkler, electrical and plumbing contractors using 3D MEP coordination software to develop a optimum design within a designated budget.

Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers.

 

Owner: Lady Lake Re, LLC.

General Contractor: Cullison-Wright Construction corp.

Architect: O'keefe - Painter Architects, LLC.

Engineer: Mohan Engineering, Inc.

 

 

 

 

 

 

Harnett Nursing and Rehabilitation Center

Lillington, North Carolina

(Under Construction)

Harnett Nursing and Rehabilitation Center

Scope of work

New Construction

Renovation

Service

 


Services installed

HVAC/Mechanical

Plumbing

Medical Gas

3D MEP Coordination Drawings

48,142sq ft. - 96 bed rehabilitation hospital.

Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget.

Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters.

Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.

 

General Contractor: Integrated Construction LLC.

Architect: Jones & Jones Architects PC

Engineer: C. T. Clayton Sr., P.E., Inc